Brighton Colorado Community Development Homepage
Search

Brighton Solar

Steps to apply for a solar permit:


  1. New and existing OpenGov users must apply for permits on the solar page. If you are a new user, please sign up, obtain your license, and begin your solar permitting process. For design criteria please visit the Codes and Information page.
  2.  To request rough inspections: 

Photographs of the following items shall be uploaded into OpenGov for inspection and approval:

  • front of house and address
  • roof flashing
  • hold-downs
  • rail system
  • junction boxes
  • bonding
  • any required structural upgrades

Please request rough inspections through the portal. Required photos are only accepted by upload, do not submit photos as a link or zip file.

  1. Brighton Colorado Homepage

Contact Us

  1. 500 S 4th Avenue

  2. Brighton, CO 80601

  3. Phone: 303-655-2000

Government Websites by CivicPlus®
Arrow Left Arrow Right
Slideshow Left Arrow Slideshow Right Arrow