Development Services Process
Effective January 1, 2023, all credit card transactions will be charged an additional fee of 2.9% of the total amount due.
The following information outlines the processes and procedures after approval of land entitlement through vertical construction permits and out to certificates of occupancy.
Forms and template documents are available, as well as process outlines and support information. Please review the Development Impact Fee Summary Effective 8-10-2023 to complete a feasibility study. Final fees are based on approved civil and construction drawings and are the fees in effect at the time of permit issuance.
Once the plans are approved by the Development Review Committee, an ESC Permit and Site Improvement Permit are needed to begin construction. Those are issued through the Permit Counter. See the Development Permitting and Process Summary for details.
Financial Guarantees
The City must hold a financial guarantee for any work in the public right-of-way (ROW) and for public infrastructure construction before a permit is issued. The amount held is based on the schedule of public improvements from the development agreement or similar estimating documentation for the improvements. Brighton will accept a cash escrow deposit, or any of the forms listed below, depending on the type of surety required.
Please see the template documents below for the minimum language accepted by Brighton for financial security of public improvements.
- Letter of Credit Template or Subdivision Bond Template may be used when the developer of record is securing the public improvements and development. A legal agreement must exist between the developer and the city.
- ROW/New Construction Permit Bond Template may be used when a contractor is securing the public improvements for public right-of-way or other infrastructure work. No development agreement is required for this type of bond.
- ESC Permit Bond Template may be used when a contractor is securing the public improvements for ground stabilization work. No development agreement is required for this type of bond.
- Affidavit of Construction Costs Template must be completed and submitted with the as-builts in order to receive initial acceptance. Any financial guarantee held by the City for public infrastructure work cannot be reduced until all inspections are complete and this affidavit is approved.
- As-Built Drawings Submittal Specifications - a checklist of requirements for submitting as-built drawings for review.
Initial Acceptance
Upon completion of the public infrastructure, construction acceptance inspections shall be scheduled by the contractor by calling this number: (303) 655-2151
Any necessary inspections will be completed by the applicable departments. If inspection(s) is/are not passed, a punch-list of items that need to be corrected will be provided. At the time the construction acceptance inspection is called, as-built drawings, a CCTV video of the sewer line (when applicable) and an affidavit of actual construction costs shall be submitted for review. Upon approval of construction acceptance, the financial guarantee will be approved for a reduction to 15% of the actual costs submitted on the affidavit, and the two-year warranty period will begin. The contractor of record is responsible for any repairs required during or at the completion of the warranty period.
Final Acceptance
Two years from the date of construction acceptance, a final acceptance inspection can be scheduled by the contractor by calling this number: (303) 655-2151
At final acceptance, the applicable departments will inspect the infrastructure and provide a punch list for any corrections. Once those corrections are complete and the inspector signs off of final acceptance, the city assumes ownership and responsibility for the maintenance and repair of the improvements. At the time of final acceptance, the financial guarantee can be released in entirety.
Financial Guarantee Policy
Brighton accepts guarantees in the form of bonds, letters of credit, and/or cash escrow deposits. Brighton requires that a financial guarantee be held by the City for any work being performed in the public right of way and on public infrastructure.
The following information is provided as an outline for procedures related to the acceptance, drawdown, and release of financial guarantees:
- A schedule of public improvements, including a complete scope of work and related costs, shall be submitted; the financial guarantee shall be based on the reviewed/approved scope of work under construction.
- All forms of financial guarantee shall be accepted at the discretion of Brighton representatives.
- Bonding of projects is required at 115% of total valuation for the scope of work (materials and labor.)
- All construction is subject to inspection and approval by Brighton inspectors.
- A construction acceptance inspection in a pass status will allow the financial guarantee to be released to 15% of the original bonded amount. The 15% contingency shall be held for a two-year warranty period. The date of construction acceptance will initiate the two-year warranty period for the construction.
- At the end of the warranty period, a final acceptance inspection will be scheduled. If construction under warranty fails this inspection, a task list of corrections will be produced. The corrected work shall be inspected upon completion. All inspections shall again obtain a pass status prior to full release of the financial guarantee. Once all final-acceptance inspections are in a pass status, the financial guarantee will be released completely.
In some instances, a partial release of the financial surety may be granted.
- If a portion of work is complete, and the identified line between complete work and incomplete work is clearly defined, the construction inspector may approve a partial release of the financial guarantee.
- If the financial guarantee is in the form of a bond or letter of credit, an original document of a replacement bond or letter (reflecting the reduced amount) will be provided to Brighton prior to the release of the original document.
- The warranty period will be guaranteed at 15% of the entire scope of original construction rather than on drawn down amounts.
- In some instances, at the discretion of the inspector and/or other city representatives, construction may not be required to be held for warranty.
- All financial guarantees will be released promptly once project construction has obtained a pass status on final acceptance inspections.
In some instances, a financial guarantee can be provided to ensure future completion of private work in order to allow the issuance of a certificate of occupancy prior to construction completion. Examples include seasonal landscaping, sod, or concrete work. Please note that these types of performance bonds are reviewed on a case-by-case basis and acceptance is not guaranteed.
Contact Us
Jordan Kowalenko - (303) 655-2072
Or, use our Request for Information Form for general inquiries related to Development Services.
Helpful Links
Construction Site Stormwater Management and Erosion and Sediment Control Permit (ESC) Forms